For foreign investors and relocating businesses

Build in Georgia
without being here

Full-cycle general contractor in Tbilisi: land due diligence, permits, monolithic construction and handover. The price and the completion date are fixed in the contract and do not change. You follow every stage online.

12years
in Georgia
180km²
built
40projects
delivered

Why Georgia

A simple place
to own and build

Georgia ranks among the easiest countries to start a business and register property. The facts below are the ones that matter for a construction project. Verify each with your tax adviser: rules change.

◆

0% on reinvested profit

Corporate income tax is charged only when profit is distributed. Reinvested profit is taxed at zero.

◆

Company in one day

An LLC is registered at the Public Service Hall within a day. Foreigners can own 100% and be the director.

◆

Free Industrial Zones

Zones in Tbilisi, Kutaisi and Poti offer exemptions on profit, property and VAT for qualifying production and logistics.

◆

Free capital movement

No restrictions on bringing money in or taking profit out. Property registration takes one to four days.

The one restriction to know

Foreign citizens and foreign-owned companies cannot own agricultural land. Many attractive plots around Tbilisi are still classified as agricultural. Buying one requires changing its category first or structuring the purchase through a Georgian entity. This is exactly why we check the plot before you pay for it.

Who we build for

Three kinds
of clients abroad

01 / 03

Rental income investors

Residential building or apart-complex for long-term or short-term rent in Tbilisi. You want a predictable budget and a completion date you can put into a financial model.

A fixed-price contract, staged payments against signed acts, and a monthly report your bank or partners can read.

03 / 03

Families moving to Georgia

A house of 160 m² and up in Tskneti, Kojori, Saguramo or Mtskheta, built while you are still abroad.

Weekly video reports, an online dashboard, and a house delivered ready for finishing at the price we agreed.

Remote control

You see the site
every week

Most of our foreign clients visit the site two or three times during the whole project. Everything else happens online and on paper you can verify.

Online dashboard
Schedule, budget, documents and photos, updated every week
Video reports
Weekly walk-through video from the site engineer, in English
Payments against acts
You pay for each completed stage after signing the acceptance act, not in advance
Independent supervision
A third-party technical supervisor checks every critical stage and signs the acts with you
Power of attorney
One notarised document lets us handle permits and utility contracts on your behalf
Your own inspector
You may appoint any engineer or firm to inspect the site at any time

Fixed price

The estimate you sign
is the amount you pay

Before construction starts we produce a detailed design and a line-by-line estimate. It becomes an annex to the contract and is not revised for currency, material prices or our own mistakes.

01 / 03

What is fixed

Full bill of quantities, completion date, scope, materials and their grades, penalties for our delay.

03 / 03

If you change the brief

We price only the difference, sign an addendum, and start after you approve. No surprises discovered mid-build.

Monolithic frame
from $180 / m²
Shell with facade and windows
from $300 / m²
Ready for fit-out, with utilities
from $380 / m²

Indicative 2026 ranges for Tbilisi, materials and labour included, design and permits excluded. Your fixed price is set after the design stage.

Worked example

A 3 000 m² warehouse
for rent near Tbilisi

A model calculation, not a signed project. It shows how the numbers fit together for a typical rental warehouse. Land price, rent and yield vary by location and must be checked for your case.

Building
3 000 m², class B warehouse, 10 m clear height, 2 loading docks, office block 150 m²
Land
6 000 m², non-agricultural, Rustavi highway corridor
Construction, ready to operate
~$1.1M at ~$370 / m² fixed
Design and permits
~$60k
Construction period
8 months from permit, first hall in 5
Market rent 2026
$5–7 / m² per month
Gross annual rent
$180k–250k
Gross yield on construction and design
15–21% before land, tax and vacancy
What changes the picture

Land cost can add $150k–400k depending on distance from the city. A Free Industrial Zone location removes property tax and VAT on the building but limits the tenant pool. A pre-let to a logistics operator before construction improves bank financing terms. We run this calculation for your actual plot as part of the assessment.

How it goes

From first call
to keys

01

Brief

A video call. Goal, budget, timeline, land status. Free.

02

Site check

15-point due diligence on your plot or on plots we shortlist. 3 days.

03

Design and estimate

Concept, detailed design, line-by-line estimate. 2–3 months.

04

Contract and permit

Bilingual contract signed, permit obtained. 1–3 months.

05

Build and handover

Weekly reports, staged acts, independent supervision. 8–18 months by type.

Questions we get

Before you
ask

Can I own the land and the building as a foreigner?

Yes for non-agricultural land and any building. Agricultural land cannot be owned by foreigners or foreign-owned companies. We check the category before you buy.

Do I need to come to Georgia?

Once, to sign at the notary and open a bank account, or not at all if you act through a power of attorney issued at a Georgian consulate. Site visits are optional.

How do payments work?

A deposit for design, then stage payments after each acceptance act is signed by you or your supervisor. Bank transfer in USD, EUR or GEL to a Georgian account.

What if material prices rise during construction?

That is our risk. The contract price does not change unless you change the brief.

Does building give me residency?

Owning real estate above a threshold value or running a Georgian business can support a residence permit application. Ask our partner law firm; we do not give immigration advice.

Which languages do you work in?

English, Russian and Georgian. Reports, the contract and the dashboard are in English.

Next step

Tell us about
your project

We reply within one business day with a first assessment: is the site buildable, what the process looks like for a non-resident, and a preliminary cost range per m².

+995 599 538 277WhatsApp · Telegram · English, Russian, Georgian

  1. 01Brief
  2. 02Site check
  3. 03Estimate
  4. 04Fixed contract
Choose a project type
Please enter your name
Please leave a way to reach you

By submitting you agree to our privacy policy.

→

Details ready

Review the message and send it to us on WhatsApp.

Continue on WhatsApp ↗
WhatsApp↗
Discuss a project